Location: Gainesville, FL
Owner: UF Health Shands
Completion:
The UF Health Shands North Tower 2nd Floor Master Plan included the renovation of operation rooms, prep/PACU/recovery rooms, staff support areas, and administration areas. Phase 2 involved the renovation of 21 operating rooms, each with intricate equipment, med gas, and electrical work being installed. This was an occupied construction process that required keeping all adjacent ORs open, fully-functioning, and without incident during the entire duration of this process with only ICRA containment walls dividing the construction site from the active hospital environment.