Location: Gainesville, FL
Owner: Alachua County School Board
Completion: July 2021
"Establishing a safe and positive learning environment."
This project consisted of a new two-story classroom building and a one-story covered play building with a student capacity of 900 students. The structure is tilt panel construction with storefront and curtain wall. The roof system is a standing seam metal roof. Building 100 was constructed as an EHPA storm shelter per the Hurricane Protection Act. The duration for completion was 11 months from clearing to substantial completion.